Post-Construction & Handover Cleaning

Post-construction cleaning is staged: a builder’s clean to remove bulk debris, then a sparkle clean to handover standard, then a final touch before the client walks the building.

It is measured against a snag list, and the deadline is somebody else’s completion date.

Stages

  • Builder’s clean — bulk debris, dust and protective film removal
  • Sparkle clean — glass, frames, fittings and finishes
  • Final handover clean, immediately before inspection
  • Snag rectification cleaning
  • Fit-out and refurbishment turnover between tenancies

The three stages in detail

StageScopeCompleted before
Builder’s cleanBulk debris, dust suppression, protective film and label removal, rough floor cleanSecond fix completion
Sparkle cleanGlass inside and out, frames, ironmongery, sanitary ware, all finishes, final floor treatmentClient inspection
Handover touchRe-clean of anything marked since sparkle, final glass, floorsKey handover

What makes it go wrong

  • Trades still working after the sparkle clean, which means paying for it twice
  • Protective film left on beyond its rated life, which bonds and will not lift cleanly
  • Grout haze and plaster splash left until the final stage, when it needs mechanical removal
  • No power or water on site at the scheduled date
  • Snag rectification cleaning not allowed for in the programme