Access-controlled, permit-driven.

Facade & High-Level Cleaning

Facade work is as much an access problem as a cleaning one. Rope access, cradle systems and reach equipment each carry their own certification, permit and weather constraints.

Placed only with partners holding the relevant access certification and insurance for working at height.

Scope

  • External glass and curtain walling
  • Facade washing and surface treatment
  • Rope access, cradle and mast climber operation
  • High-level internal atria and light wells
  • Signage, canopy and soffit cleaning

Access methods and when each is used

MethodTypical useConstraint
Rope access (IRATA)Tall facades with anchor provision; fastest mobilisationRequires certified technicians and tested anchor points
Building maintenance unitTowers with a permanent cradle installedSubject to the BMU’s own inspection certificate
Suspended cradleBuildings without a permanent BMURigging time, and wind limits stop work
Mast climber / MEWPLow and mid-rise, podium and atriaNeeds ground bearing capacity and exclusion zones
Water-fed poleUp to roughly four storeysReach limited; purified water supply required

What constrains the programme

  • Wind speed stops high-level work, so schedules carry contingency days
  • Permits to work, exclusion zones and pedestrian management at ground level
  • Occupied buildings restrict working hours and require occupant notice
  • Anchor and cradle certification must be current before mobilisation
  • Facade material dictates chemistry β€” anodised, stone and coated glass differ